Shingle re-roof
This re-roofing project was completed in one day. It involved tearing the existing shingles off. Once the old shingles are out of the way, we inspect and repair the wood decking as needed. A new layer of felt is then installed over the entire area. Ice and watershield is installed in the valleys for an extra layer of protection. New architectural shingles with a lifetime warranty were then installed. Venting and flashings completed the job. All debris was cleaned up and hauled away. It was a long day but in the end, the roof was beautiful.